- The Olap plant in Viale Romagna in Milan, which manufactured Siemens telephone systems and equipment until 1960. 1926
- The Siemens SpA headquarters in via Fabio Filzi 29 in Milan in 1939
- Bologna, State Railways telephone exchange. 1947
- Plant in via Monte Rosa: assembly line of the Model 36 device. 1956
- Monterosa plant: assembly of radio equipment. 1956
- Monterosa Plant: Television Testing. 1956
- Eltel plant/Palermo 1: Installation of wire speakers. 1969
- Aerial view of the Sit Siemens facility in Milan that was the production site of Microwave Transmissions, Multiplex systems and other transmission equipment. 1963
- Unified desktop telephone set. 1963
- San Siro plant: testing of the switching centers, SMN system. 1964
- The first electronic control unit in Italy. It entered service in July 1965 as part of the Rome urban network
- Photo advertising the device "Grillo, the phone in the palm of your hand". 1968
- Plant of S.M. Capua Vetere: "Grillo" assembly line. 1968
- Ela 43-14 “Diffy” radio receiver. 1969
- Palermo 1 plant: assembly line for the colored Grillo luminaire. 1974
- Proteo electronic control unit installed at the Sip “Colombo” headquarters in Rome. 1978
- Private telephone switchboard intercommunicating by relay. 1970
- ESK telephone exchange in Milan Turro. 1970
- Castelletto di Settimo Milanese: overview of the warehouses. 1971
- Castelletto plant: layout of the printed circuit drawings. 1974
- Monterosa factory, Milan: printed circuit assembly room. 1971
- L’Aquila 2 plant: cabling of frames for public telephone exchanges. 1974
- System testing of the Proteo electronic control unit. 1976
- S.M. Capua Vetere plant: Cobra device production line. 1985
- Processing phase of printed circuits in the Castelletto plant. 1985
- Giorgio Armani “Notturno” telephone additional telephone. 1986
- Pubblicitè Notturno Armani
- «A woman leading 30,000 men»: this is how a national newspaper commented the appointment of Marisa Bellisario as CEO of Italtel
- Marisa Bellisario with Bettino Craxi and the mayor Tognoli visiting the Italtel stand at Smau in Milan. 1984
- Palermo: technicians at work on a Proteo UT exchange. 1985
- S.Siro plant: system tests of the Proteo UT10 / 3 electronic control unit. 1982
- Castelletto plant: assembly of the plates of the Proteo UT10 / 3 plant. 1985
- Palermo2 plant: tests on the Proteo UT10 / 3 plant for foreign countries. 1985
- Under the management of Salvatore Randi, Italtel signs an agreement with the American AT&T. 1989
- In the Castelletto Training Center, customers attended courses on Italtel technology
- Castelletto plant: testing of the UT LINE plant for Kenya. 1990
- UT 100 electronic telephone SIP exchange installed at Como. 1990
- The products and the integrated solutions were exported to many markets mainly in Europe and Latin America.
- The demo center in Castelletto was home to solutions for cloud computing, video communication, smart networks, mobility solutions
#Italtel100